MINNESOTA · CLASS A JOURNEYWORKER ELECTRICIAN

Minnesota Journeyman Electrician Exam: Format, NEC Edition & Requirements

Everything you need to plan for the Minnesota Class A Journeyworker Electrician exam, given by State-run (DLI): format, code edition, fees, experience, and how to prepare — with links to the official sources.

Minnesota journeyman exam at a glance

License
Class A Journeyworker Electrician
Exam provider
State-run (DLI)
Time limit
5 h 30 min
NEC edition
2026 NEC
Exam fee
$50
Experience
4 years

Some details couldn't be confirmed from official pages yet and are left out. Always check the current candidate bulletin before you book.

Code book and format

Code edition. The Board of Electricity adopted the 2026 NEC effective August 17, 2026. DLI says the licensing exams began moving to the 2026 NEC on September 8, 2026. Permits filed before August 17, 2026 stay under the 2023 NEC.

DLI gives its own exams at its St. Paul office and at regional sites across the state. All electrical exams have a 5.5-hour limit. You schedule through DLI's iMS system after your application is approved.

Who licenses electricians in Minnesota

Minnesota Department of Labor and Industry (DLI), Board of Electricity ↗

Minnesota Rules 3800.3520 require at least 48 months of experience, with at least 24 months spent wiring and installing. Maintenance and repair counts for up to 24 months, and smaller amounts are credited for process control, elevator, technology circuit, and line work. A board-approved two-year post-high-school electrical program can count for up to one year.

Fees and retakes

The $50 fee covers both the application and the exam. The initial license fee was not shown on the DLI pages that were reviewed.

Renewal and reciprocity

Renewal. Every two years, ending in the month the license was first issued. You need 16 hours of DLI-approved continuing education, at least 12 of them on the NEC. The renewal fee is $53, plus $20 if you renew late.

Reciprocity. Your out-of-state license must be the same or a higher class, earned by passing a state-level exam, and held for at least one year. You must not have failed the same or a higher Minnesota exam, and you pay the $50 application and exam fee. States listed: Alaska, Arkansas, Colorado, Iowa, Montana, Nebraska, North Dakota, South Dakota, Wyoming.

How to prepare for the Minnesota exam

  1. Take a baseline. The free Minnesota practice test shows which topics cost you points.
  2. Learn the code book layout. Most journeyman exams are open book, so speed matters: learn which chapter and article to open before you touch the book. Free lesson →
  3. Drill the calculations. Ampacity, voltage drop, box and conduit fill, dwelling loads, motors and transformers — with live calculators inside each lesson.
  4. Sit a timed practice exam a week before your appointment, then study only what you missed.

Ohmward lessons follow the 2023 NEC. Minnesota uses the 2026 edition: most exam rules are the same, but check section numbers and changed rules in your own code book.

Minnesota journeyman exam: common questions

How long is the Minnesota journeyworker electrician exam?

DLI gives you 5.5 hours for every electrical license exam.

What NEC edition is the Minnesota exam based on?

The 2026 NEC. DLI started moving its licensing exams to the 2026 code on September 8, 2026.

How much experience do I need for a Minnesota Class A journeyworker license?

At least 48 months, including at least 24 months of wiring and installing. A board-approved two-year electrical program can count for up to one year.

How much does the Minnesota journeyworker exam cost?

The application and exam fee is $50.

Does Minnesota have reciprocity for journeyman electricians?

Yes, with Alaska, Arkansas, Colorado, Iowa, Montana, Nebraska, North Dakota, South Dakota, and Wyoming, if you meet DLI's conditions.

Official sources

Last checked 2026-11-26. Requirements change — confirm with the licensing board and exam provider before you apply.

What we couldn't confirm yet
  • Number of questions, passing score, and open/closed-book policy were not found on an official DLI page (DLI's electrical exam guide and a Board comparison chart that reportedly covered this could not be opened; the chart URL now returns 404).
  • Whether DLI supplies the code book in the exam room or candidates bring their own.
  • Retake waiting period and initial license fee.